Bathroom renovations in Vancouver, BCEvery day.
Elevated.

A better shower. Beautiful tile. A vanity that brings the room together. Thoughtful bathroom renovations for homes and condos, with careful installation at the heart of the work.

Vancouver & the Lower Mainland.
Tell us what you would love to change. We’ll help define the installation scope.

Contemporary bathroom with a freestanding bathtub, glass shower and blue floating vanity
A little more calm. Every single day.
25+
Years of experience in the industry
1,000+
Projects completed across our installation services
WCB
WorkSafeBC coverage
$5 million
Liability insurance

Your bathroom. Reconsidered.

Make room
for better.

Refresh a tired ensuite, rethink the shower or bring a small bathroom into its own. We bring the tile, preparation and finish installation together around the way you use the space.

Marble-look tiled wet room with a black shower fixture, freestanding bath and mosaic floor

Rethink
your shower.

Shower renovations, tub surrounds and wall tile, with niches, edge details and tile layouts planned together. Walk-in or tub-to-shower changes start with a review of the existing room and the work required.

Discuss your shower ↗
Long white bathroom vanity, illuminated mirror and glass shower with gold trim

A considered finish.

Vanity and vanity-top installation, backsplashes and clean transitions. We confirm the dimensions and installation responsibilities before the finishing pieces arrive.

Plan your finishes ↗
Bathroom with a white bathtub, glass shower and coordinated marble-look floor and wall tile

Beautiful underfoot.

Porcelain, ceramic and stone floor tile with preparation, layout and doorway transitions resolved first. Heated tile floors can be included where the floor assembly and electrical scope allow.

Explore your floor ↗

Our focus is installation. Your written scope identifies the tile, preparation, vanity and finish work included, along with responsibilities for demolition, plumbing, electrical, glass, permits and other trades. Materials and fixtures are confirmed with you before work is scheduled.

The details you don’t see

Good design
starts beneath
the surface.

Explore shower & wall tile ↗

Tile and grout are the finish. A shower’s water management depends on the assembly behind them. That is why substrate condition, waterproofing details and connections belong in the plan from the beginning.

  • Start with the existing room.Assess the walls, floor and visible condition. Agree how concealed damage or additional preparation will be handled if uncovered.
  • Plan the wet area as a whole.Confirm compatible waterproofing components and details at corners, niches, penetrations and shower transitions, following the selected system’s instructions.
  • Resolve the finishing lines.Set out tile, trims, joints and fixture interfaces before installation. Allow the required curing and testing stages in the agreed schedule.

Installation materials

The materials behind the finish.

Established installation brands, with materials selected around your bathroom’s substrate, wet areas and finishing details.

  • LATICRETE
  • Schluter Systems
  • MAPEI
  • ARDEX
  • Custom Building Products
  • Flextile

The product system is confirmed for each project, with compatible materials selected for the agreed installation scope.

Homes, condos & smaller spaces

Designed around
real life.

Condo bathroom renovations.

Strata requirements, permitted working hours, elevator bookings and water shutoffs can shape the programme. Share your building’s rules early so access, protection and trade responsibilities can be agreed before work begins.

Small bathrooms. Better use.

A small bathroom renovation can begin with the existing layout. Tile proportions, vanity dimensions and shower details can change how the room feels without assuming that walls or plumbing must move.

Ensuites with room to unwind.

Bring together a quieter material palette, a practical vanity and a shower that suits your routine. Tell us about storage, cleaning and access priorities so the installation details support the way you live.

Bathroom renovation costs in Vancouver

A clearer scope.
A clearer estimate.

A shower refresh and a complete bathroom change involve different work. We review the room and your priorities so the estimate reflects the installation you actually need.

01

Existing conditions

Removal, access to the substrate, previous leaks and repairs can affect preparation and disposal requirements.

02

Shower & waterproofing

The shower base, wet-area assembly, niches and transitions affect the installation scope and sequence.

03

Tile & layout

Tile dimensions, pattern, material, edge treatment and detailed cuts influence preparation and installation time.

04

Vanity & finishes

Cabinet dimensions, vanity-top details, backsplash height and interfaces with fixtures need to be confirmed.

05

Other trades & approvals

Plumbing or electrical changes, glass and permits must have clear responsibilities and allowances where required.

06

Building & schedule

Strata rules, parking, protection, working hours and material availability can influence how the work is organised.

Start with your city, approximate bathroom dimensions and the changes you have in mind. If you have photos or plans, mention them in your enquiry; we can arrange how to review them with you.

Get a free bathroom renovation quote

From the first conversation

A thoughtful
way forward.

Make the important decisions before installation starts, with a scope that connects the room, the materials and the work.

  1. Tell us what needs to change.

    Share your bathroom, project city and priorities. We’ll discuss whether you need a shower update, new tile, vanity installation or a broader combination of work.

  2. Review the room & scope.

    Confirm existing conditions, selected materials, preparation, building requirements and the trades involved. Agree inclusions, exclusions and how changes will be approved.

  3. Install. Finish. Review.

    Work follows the agreed sequence, including preparation and the selected assembly’s curing or testing requirements. Review the finishing details and care guidance at handover.

Let’s talk about your bathroom

Get your free
bathroom renovation quote.

Share your project city, property type and the bathroom, shower, tile or vanity work you have in mind. We’ll review the details and explain the next step. A site review may be needed before confirming the scope and price.

778-803-4737info@priorityoneflooring.com
Based in Richmond. Serving Vancouver
and the Lower Mainland.
#130 – 7900 Westminster Hwy
Richmond, BC V6X 1A5
  • 25+ yearsof industry experience
  • WCB coverageworkers’ compensation
  • $5M insurancecoverage

Your details will be used to respond to this enquiry. A free quote request is the first conversation, with scope and availability confirmed before scheduling.

Before you begin

A few
good questions.

What bathroom renovation work do you focus on?

Priority One Flooring focuses on tile, shower and tub-surround installation, preparation, vanity tops and bathroom finishes. Your proposal identifies the work included and who is responsible for demolition, plumbing, electrical, glass and other trades. Share the whole project so these interfaces can be reviewed early.

How much does a bathroom renovation cost in Vancouver?

The cost depends on the room, removal and repair needs, shower assembly, tile layout, vanity details, building access and other trade work. A site-specific installation estimate is more useful than a generic package price. Share your approximate dimensions, project city and intended changes to get started.

Do you work on condo bathrooms and small ensuites?

Yes. Condo bathroom renovations and small ensuites need careful layout and access planning. Share strata rules, permitted working hours, elevator arrangements and any water-shutoff requirements. Building approvals and responsibility for trade permits should be confirmed before installation is scheduled.

Can I keep the existing bathroom layout?

Often, that is a useful starting point. New tile, a different vanity or a shower refresh can improve the room while retaining key locations. The existing substrate, fixture dimensions and any concealed damage still need to be reviewed before the installation scope is finalised.

Can a bathtub be changed to a walk-in shower?

A tub-to-shower conversion starts with feasibility. Drain position, floor depth, waterproofing, access, glass and plumbing responsibilities must be reviewed together. Curbless access depends on the building and floor assembly; it cannot be assumed from a photograph or room dimensions alone.

Do bathroom renovations need permits?

Requirements depend on the work and municipality. Moving walls or plumbing and electrical lines can trigger permits; some straightforward finish replacements may not. Confirm the requirements with the relevant authority and identify who will obtain permits and arrange inspections. Strata approval is a separate building requirement. See the City of Vancouver’s permit guidance ↗

How long will my bathroom be out of use?

There is no reliable single timeline for every bathroom. Removal, repairs, trade work, waterproofing, curing, tile setting, glass and inspections affect the sequence. The schedule and expected bathroom downtime should be confirmed once the scope and material availability are known, especially if it is your only bathroom.

Can you install tile and fixtures I have already selected?

Tell us what you have chosen before ordering or scheduling. Tile dimensions, installation requirements, quantities and delivery timing need review, along with vanity and fixture dimensions. The written scope confirms what you provide, what installation includes and any responsibilities that remain with other trades.